The general planning( pdf ou edms) The machine itself The injection-ejection lines
The controls for LEIR The different areas(zône_H(passerelle), zône_H(ground), equipment room, bat 249, bat 250)
_____________________________________________________________________________________________________
The last presentations: PS days(LEIR, PIL) , ECOOL2001, SLI, PS technical meeting(29-08-2001), LCC(12/09/2001)
LCC(13/03/2002) PSMB(25/03/2002) PILLEIR(03/04/2002) , PS SEMINAR(NOV 2002)
LHC IONS WORKSHOP(28/06/2002)( LINAC3 , LEIR and PS, SPS and LHC, all presentations)
_____________________________________________________________________________________________________
Important publications: LEAR, Feasability study IONS in LHC IONS tests IN LEAR LEIR LEIR at EPAC2002
______________________________________________________________________________________________________
Compte rendu of some of the ealier meetings
Compte rendu of the PILLEIR meetings
Some photos of LEAR in THE OLD TIME